*排水板的施工工艺流程*
泰东工程材料专业生产塑料排水板车库排水板厂家并且提供施工工艺如下:*排水板的施工工艺流程* 1. 底板清理在施工前应将车库底板清扫完毕,施工基面要平整、坚实,不能有起砂、尖凸、空鼓、坑洼等现象。2. 卷材辅设将卷材在结构底板上按一定前后左右顺序铺设搭接,在卷材前后及左右当中设有大小搭接柱,应将小搭接柱套入大搭接柱。*排水板的施工工艺流程*3、为防止施工中漏水或卷材滑动可在搭接边上涂上胶水或一定距离用水泥浇注水泥点固定。浇注用C20细石混凝土浇注在卷材上,用直杆抹平,高出1-2cm待硬化方能进行后续施工。2、在混凝土凝固后扎钢筋,浇筑混凝土面层,在底板中设置排水沟、集水井。4. 注意事项卷材铺设必须搭接完整并固定以防漏浆。铺设时应穿软底或无钉鞋以防刺破卷材,铺设时切忌用重车在卷材上直接行驶以防材料被压扁或压破。5、注意材料防火。排水板厂家专业排水板生产厂家。
Taidong engineering materials specializing in the production of plasticdrainage plate garage drainage board factory and construction technology are as follows:*排水板的施工工艺流程*
The 1 floor cleaning before construction should be the garage floorcleaning is completed, the construction of the base surface to smooth,solid, not a sand, pointed convex, hollowing, potholes and other phenomena. The 2 coil auxiliary coil on the floor in a certain order layingaround the lap, with the size of the Lapping Column in the coil and after about, should be small lapping column is sheathed in the big lapping column. 3, to prevent Water Leakage or roll sliding construction can be in the overlap edge glue or a certain distance with cement pouri*排水板的施工工艺流程*ng cementfixed point. Casting with C20 fine stone concrete pouring in the web, with a straight rod smooth, high 1-2cm to be hardened to the subsequent construction. 2, in the concrete is solidified reinforcement, pouringconcrete surface layer, a drainage ditch, the water collecting well is arranged in the base.*排水板的施工工艺流程* 4 note coil laying must lap complete and fixed to leak plasma. When installation should wear soft soled or no spikes topuncture proof material, laying of abandoning the use of heavy vehiclesin the web directly driving to prevent material is compressed or crushed.5, pay attention to fire prevention materials. Drainage platemanufacturers of professional drainage board manufacturers.*排水板的施工工艺流程*